迅维网

标题: 常用英文簡語查檢表 [打印本页]

作者: 梧桐叶    时间: 2010-8-6 08:10
标题: 常用英文簡語查檢表
常用英文简语查检表                                                       
3T        Train-The-Trainer                FRU        Field Replacement Unit                RD        Research & Development
8D        Eight Discipline                FVT        Function Verification Test                RDT        Reliability Domestication Test
AQL        Acceptable Quality Level                FW        Firmware                RMA        Return Material Authorization
AOQL        Average Outging Quality Limit                GDS        Globe Distribution Service                RRF        Return Rate Factor
ASAU        Automatic Side Access Units                HDD        Hard Diskette Driver                RRP        Return Rate Prediction
ASQC        American Society for Quality Control                HDI        HDD compression Inspection                RSP        Require Supplier Plan
BGA        Ball Grid Array                HW        Hardware                RTD        Real Time Decision
BIOS        Basic Input/Output System                ICT        In Circuit Test                RTV        Return To Vendor
BOM        Bill of Material                IFI        In Flow Information                RVT        Production Verification Test
BTO        Build To Order                IOD        International Operations Department                SAP        System Applications And Products in data Processing
CAD        Computer Aided Design                IQC        Income Quality Control                SE        System Engineer
CAI        Computer Aided Issue System                ISO        International Organization for Standardization                SFM        Shop-flow management
CAM        Computer Aided Manufacturing                IUR        Internal Unit Requirement                SI        Seed Internal (Build)
CBT        Computer Base Training                JIT        Just In Time                SIT        Seed Internal (Build)
CD-ROM        Compact Disc Read-Only Memory                LCM        Liquid Crystal Module                SKD        Simi Knock Down
CDS        Closed-loop Design System                ME        Mechanical Engineer                SL        Speedily Learning
CKD        Complete Knock Down                MIS        Management Information System                SMT        Surface Mount Technique
CLCA        Close Loop Corrective Action                MN        Manufacturing Notice                SOP        Shortage Order Purchase-balance
CLCA        Close Loop Current Action                MP        Main Production                SP        Strategic Planning
CND        Can Not Duplicate                MRB        Material Review Board                SPC        Statistical Process Control
COO        Country-Of-Origin                MRP        Material Require Plan                SRS        Synchronous Reporting System
CPK        Process Capability                MTBF        Mean Time Between Failure                ST        System Test
CPU        Central Process Unit                MTD        Manufactrue Technology Department                SW        Software
CSI        Customer Satisfaction Index                MV        Manufacturing Verification                SWAT        Strengths Weaknesses Opportunities Threats
CTO        Configure To Order                MVB        Manufacturing Verification Build                TFT        Thin Film Transistor
CWQC        Company Wide Quality Control                MVS        Manufacturing Verification System                TOC        Theory Of Constraints
DFP        Drive Failure Prediction                ODM        Original Developing Manufacturer                TPM        Total Productive Maintenance
DOA        Dead On Arrival                OEM        Original Equipment Manufacturer                TQM        Total Qullity Management
DPPM        Defect PPM                OJT        On Job Training                TTI        Time To Idea
DRRF        Defect Return Rate Factor                OQC        Outging Quality Team                TTM        Time To Marketing
DSTN        Dual Super Twist Ncumatig                ORT        On-going Reliability Test                TTP        Time To product
ECN        Engineering Change Notice                PCA        Print circuit board Assembly                TTV        Time To Value
ECO        Engineering Change Order                PCMCIA        Personal Computer Memory Card Interface Association                TWI        Training Within Industry
ECR        Engineering Change Requests                PCN        Production Change Notice                UST        User Environment Test
EDI        Electronic Data Interchange                PDCA        Plan Do Check Action                USB        Universal Serial Bus
EE        Electrical Engineer                PDP        Product Per Plan                VGA        Video Graphic Adapter
EMEA        Europe,Mid-East,Africa                PI        Pilot Inspection                WAT        Wide Area Test
EMI        Electro Magnetic Interference                PIA        Product Integrity Audit                WIP        Work In Process
EOCT        (Enhance)Outgoing Compatibilty Test                PMP        Process Management Plan                WNF        Will Not Fixed
EORT        Enhanced On-going Reliability Test                PNP        Plug-and-play                DMR        Defect Material Review
EOS        Electrical Over Stress                PPM        Percentage Per Million                NCMR        Non-Conforming Material Request
EPIA        Enhanced Product integrity Audit                PTX        Process customer TAX                       
ESD        Electro State Discharge                PV        Pilot Verification                       
FAI        First Article Inspection                PVB        Pilot Verification Build                       
FDD        Floppy Diskette Driver                PVE        Process Value Engineering                       
FFR        Field Failure Rate                PVS        Packing Verification System                       
FIS        Factory Information System                PVT        Product Verification Test                       
FMFA        Failure Mode Effectness Analysis                QA        Quality Assurance                       
FPF        First Pass Fail                QBR        Quarterly Business Review                       
FRR        Field Return Rate                QIT        Quality Improvement Team                       

作者: 赣州维修站    时间: 2010-8-6 08:28
有没有电路图里的英文详解哦。
作者: 龙芯电脑维修    时间: 2010-8-6 09:02
很好的资料,要是再加上翻译和解释就最好不过啦,收下。
作者: sdlyliuh    时间: 2010-8-6 10:10
有汉语解释就好了
作者: 今晚还打老虎    时间: 2010-8-6 12:48
还可以吧

作者: 梧桐叶    时间: 2010-8-19 08:39
帖子很多 不一定能碰上 楼主有什么需要探讨的 自己发帖了给我留言
作者: 断红尘    时间: 2010-8-19 08:57
我的妈呀,一头雾水
     这都事啥玩意啊,,,,,
作者: 梧桐叶    时间: 2010-8-31 20:09
回复 叶子1984 的帖子


    呵呵 伟人有泽东 泽民  我来泽(中)文吧
作者: 贵在坚持    时间: 2010-8-31 20:26
真的需要翻译一下




欢迎光临 迅维网 (https://www.chinafix.com/) Powered by Discuz! X3.4